Line-item breakdown grounded in regional labor rates, current material prices, and permit fees. Not a formula — an actual estimate built from real construction data.
Select the category that best describes your project.
Something went wrong. Please try again.
ChatGPT gives you a guess. We give you an estimate grounded in the same data professional estimators use.
Cost-per-sqft ranges by project type and region, sourced from RSMeans City Cost Data 2024 and Dodge Construction Outlook. Calibrated to current market conditions.
Prevailing wage rates by trade and metro area from BLS OES data. Includes full burden rate (taxes, insurance, benefits) — not just the bare wage. Covers 15+ major metros.
2026 import tariffs applied to steel (+25%), copper (+7.5%), HVAC (+10%), and other affected materials. Every tariff-impacted line item is flagged with the exact dollar impact.
Building permit fee schedules for 20+ jurisdictions. Accurate permit estimates by city — not a generic 1% rule. Covers top US metros with verified fee formulas.
As contractors complete projects on BuildStackHub, real actuals feed back into the benchmark data. Month 1: industry data. Month 24: cross-contractor intelligence.
Full report includes a professional bid package — formatted with scope of work, payment terms, exclusions, and validity period. Ready to attach to a client proposal.