2026 Construction Material Price Tracker

Monthly prices for 9 core construction materials — tracked weekly since April 2025. 542 observations. Tariff exposure flagged. Real data, not estimates.

📅 Last Updated: May 3, 2026 📊 542 data points tracked 🏭 9 materials, 13 months

What Construction Material Prices Are Doing in 2026

  • Lumber is the biggest mover: +34.8% year-over-year. From $409/MBF in April 2025 to $476/MBF in April 2026. Market-driven — no tariff on framing lumber.
  • Steel up 26.1% — but tariffs make it worse. Tracked market price $1,602/ton. With 25% tariff applied: $1,975/ton. Combined market + tariff effect is significant.
  • All copper products up 20%+. Copper wire +22.2%, plumbing copper +21.1%, electrical wire +19.3%. All carry a 7.5% tariff on top of market increases.
  • HVAC up 13.1% — tariff makes it 10% worse. Tracked market price $1,842/ton capacity. Tariff-adjusted: $2,035/ton.
  • Concrete is the most stable at +7.2%. Lowest increase of any tracked material. No tariff exposure.
  • Nothing got cheaper. Every one of 9 tracked materials is up year-over-year. Average across all 9 materials: +18.4% from April 2025 to April 2026.

Current Prices — May 2026

Most recent monthly averages from BuildStackHub's weekly tracking database. Tariff exposure flagged.

Lumber (Framing)
$476
per MBF (thousand board feet)
↑ +34.8% vs Apr 2025
No Tariff
Structural Steel
$1,602
per ton (market) / $1,975 tariff-adj.
↑ +26.1% vs Apr 2025
25% Tariff
Copper Wire
$4.84
per lb / $5.21 tariff-adjusted
↑ +22.2% vs Apr 2025
7.5% Tariff
Plumbing Copper
$28.03
per 10ft section (3/4 in) / $30.13 adj.
↑ +21.1% vs Apr 2025
7.5% Tariff
Roofing Shingles
$93.58
per square (100 sqft)
↑ +17.0% vs Apr 2025
No Tariff
Electrical Wire (12 AWG)
$71.78
per 250ft roll / $77.16 tariff-adj.
↑ +19.3% vs Apr 2025
7.5% Tariff
HVAC Equipment
$1,842
per ton capacity (residential) / $2,026 adj.
↑ +13.1% vs Apr 2025
10% Tariff
Drywall (4x8 sheet)
$14.44
per 4x8 sheet (1/2 in gypsum)
↑ +12.3% vs Apr 2025
No Tariff
Concrete (Ready-Mix)
$164
per cubic yard (national avg)
↑ +7.2% vs Apr 2025
No Tariff

2026 Construction Material Price Summary Table

12-month tracking data with year-over-year change, 12-month range, and tariff status. BuildStackHub proprietary data.

Material Unit Apr 2025 Apr 2026 YoY Change 12-Mo Low 12-Mo High 12-Mo Avg Tariff
Lumber (Framing) /MBF $409 $476 +34.8% $358 $483 $415 0%
Structural Steel /ton $1,267 $1,602 +26.1% $1,242 $1,613 $1,421 25%
Copper Wire /lb $3.96 $4.84 +22.2% $3.91 $4.87 $4.40 7.5%
Electrical Wire (12 AWG) /250ft roll $60.16 $71.78 +19.3% $59.43 $72.69 $66.16 7.5%
Plumbing Copper (3/4in) /10ft section $23.15 $28.03 +21.1% $23.10 $28.57 $25.41 7.5%
Roofing Shingles /square $79.99 $93.58 +17.0% $79.21 $95.77 $87.39 0%
HVAC Equipment /ton capacity $1,629 $1,842 +13.1% $1,607 $1,876 $1,757 10%
Drywall (4x8 sheet) /sheet $12.86 $14.44 +12.3% $12.70 $14.62 $13.70 0%
Concrete (Ready-Mix) /cu yard $153 $164 +7.2% $145 $171 $154 0%

Source: BuildStackHub material price tracking database. 542 weekly observations. Apr 2025 = monthly average for April 2025. Apr 2026 = monthly average for April 2026. 12-Mo Low/High based on weekly readings. Tariff rates per USITC schedules effective 2025–2026.

Month-by-Month Price History: April 2025 – April 2026

Monthly averages computed from weekly observations. Full dataset: 542 observations across 9 materials.

Month Steel /ton Lumber /MBF Copper /lb HVAC /unit Concrete /yd Roofing /sq Drywall /sheet Plumb Cu /10ft Elec Wire /250ft
Apr 2025$1,267$409$3.96$1,629$153$79.99$12.86$23.15$60.16
May 2025$1,258$386$3.95$1,656$153$80.37$12.99$23.53$60.82
Jun 2025$1,257$385$4.03$1,700$154$81.19$12.90$23.63$61.04
Jul 2025$1,267$404$4.04$1,716$155$81.54$13.03$23.77$61.58
Aug 2025$1,298$388$4.15$1,703$157$83.08$13.16$24.20$62.40
Sep 2025$1,355$398$4.22$1,718$150$85.43$13.36$24.62$64.77
Oct 2025$1,393$411$4.35$1,750$154$87.39$13.57$25.30$66.26
Nov 2025$1,471$409$4.51$1,802$154$89.82$13.94$26.21$68.70
Dec 2025$1,491$412$4.53$1,798$152$92.35$14.06$26.83$69.92
Jan 2026$1,480$421$4.53$1,770$154$93.10$14.00$27.25$70.83
Feb 2026$1,516$426$4.64$1,801$155$94.51$14.18$27.19$71.99
Mar 2026$1,570$451$4.79$1,825$155$95.02$14.34$27.39$71.37
Apr 2026$1,602$476$4.84$1,842$164$93.58$14.44$28.03$71.78
YoY Change +26.1% +34.8% +22.2% +13.1% +7.2% +17.0% +12.3% +21.1% +19.3%

Source: BuildStackHub material price tracking database. Monthly averages of weekly observations. 542 total data points. Highlighted row = most recent full month data.

Material-by-Material Analysis

12-month context for each tracked material with key price drivers.

Lumber (Framing)
per MBF (thousand board feet)
No Tariff
Current (Apr 2026)
$476
YoY Change
+34.8%
12-Mo Low
$358
12-Mo High
$483
Biggest mover in the tracker. No tariff exposure — this is pure market movement driven by housing demand recovery, West Coast mill constraints, and persistent supply chain tightness. Contractors should budget $450–$490/MBF for 2026 framing work.
Structural Steel
per ton
25% Tariff
Market Price
$1,602
Tariff-Adjusted
$1,975
YoY (Market)
+26.1%
Tariff Add
+$395/ton
Double exposure: market prices up 26.1% AND a 25% Section 232 tariff on top. For steel-frame commercial buildings, this is the single biggest cost driver. Tariff-adjusted price exceeds $1,975/ton. Budget accordingly — the market price alone understates true procurement cost for imported steel.
Copper Wire
per pound
7.5% Tariff
Current (Apr 2026)
$4.84
YoY Change
+22.2%
12-Mo Low
$3.91
Tariff-Adj.
$5.21/lb
Strong upward trend throughout the 12-month period. Tariff adds $0.36/lb on top of market appreciation. Electricians doing large commercial installs with hundreds of pounds of wire feel this meaningfully. Plan for $5.00–$5.50/lb in 2026 budget estimates.
HVAC Equipment
per ton of residential capacity
10% Tariff
Market Price
$1,842
Tariff-Adjusted
$2,026
YoY (Market)
+13.1%
Tariff Add
+$184/ton
10% tariff adds $184/ton above an already rising market price. For a 3-ton residential system: $552 tariff surcharge per install. HVAC contractors should quote at tariff-adjusted prices — the market price understates actual equipment cost when procuring from tariff-exposed channels.
Concrete (Ready-Mix)
per cubic yard
No Tariff
Current (Apr 2026)
$164
YoY Change
+7.2%
12-Mo Low
$145
12-Mo Avg
$154
Most stable tracked material. No tariff exposure. 7.2% year-over-year increase is entirely market-driven by fuel costs, labor, and aggregate pricing. Regional variation is high — urban markets 30–50% above national average. Budget $150–$200/yd depending on market.
Roofing Shingles
per square (100 sqft)
No Tariff
Current (Apr 2026)
$93.58
YoY Change
+17.0%
12-Mo Low
$79.21
12-Mo High
$95.77
Consistent upward trend throughout 2025 before slight pullback in April 2026. No tariff exposure. A 1,500 sqft roof (~17 squares) now costs $1,591 in materials alone vs. $1,360 in April 2025 — a $231 increase. Quote at $90–$100/square for current material cost planning.

Construction Material Price FAQs

  • How much has lumber gone up in 2026?
    Lumber framing prices rose 34.8% from April 2025 to April 2026, from $409/MBF to $476/MBF, per BuildStackHub's weekly price tracking. The 12-month average was $415/MBF. Lumber reached a tracked high of $483/MBF and a low of $358/MBF. Lumber carries no 2026 tariff — the increase is entirely market-driven, primarily from housing demand and mill capacity constraints.
  • What is the current price of structural steel per ton in 2026?
    Structural steel averaged $1,602/ton in April 2026, up 26.1% from $1,267/ton in April 2025, per BuildStackHub's weekly tracking. Steel carries a 25% Section 232 tariff, making the tariff-adjusted price $1,975/ton. The 12-month tracked range was $1,242 to $1,613 (market prices before tariff adjustment).
  • How much is ready-mix concrete per cubic yard in 2026?
    Ready-mix concrete averaged $164/cubic yard in April 2026, up 7.2% from $153/cubic yard in April 2025, per BuildStackHub's weekly tracking. Concrete is not subject to any 2026 tariff. Regional pricing varies: urban markets like New York City, San Francisco, and Boston can be 30–50% above the national average.
  • What are roofing shingle prices in 2026?
    Roofing shingles averaged $93.58/square in April 2026, up 17.0% from $79.99/square in April 2025. The 12-month average was $87.39/square. A typical 1,500 sqft roof requires approximately 17 squares — current material cost of $1,591, up from $1,360 in April 2025.
  • How much have HVAC equipment costs increased in 2026?
    HVAC equipment averaged $1,842/ton of residential capacity in April 2026, up 13.1% from $1,629/ton in April 2025. With a 10% tariff applied, the tariff-adjusted price is $2,026/ton. For a 3-ton residential system, the tariff adds approximately $552 per unit. HVAC contractors should quote at tariff-adjusted prices for current bids.

Methodology & Data Sources

How This Data Is Collected

Tracking period: April 13, 2025 through May 3, 2026. Weekly observations published as monthly averages.

Total observations: 542 data points across 9 materials. Individual material coverage varies from 53 to 66 weekly observations.

Materials tracked and units:

  • Structural steel — per ton (2,000 lbs)
  • Lumber (framing, 2x4 equivalent) — per MBF (thousand board feet)
  • Copper wire — per pound
  • HVAC equipment (residential split system) — per ton of capacity
  • Concrete (ready-mix, standard mix) — per cubic yard
  • Roofing shingles (architectural laminated) — per square (100 sqft)
  • Drywall (1/2 in gypsum, 4x8 sheet) — per sheet
  • Plumbing copper (3/4 in type L) — per 10ft section
  • Electrical wire (12 AWG Romex) — per 250ft roll

Price basis: National average wholesale/distributor pricing. Does not include local delivery, labor, or retailer markup. Regional variation can be ±15–35%.

Tariff rates applied (when shown): Section 232 National Security Tariff (steel 25%), Section 301 tariffs (copper products 7.5%, HVAC equipment 10%). Rates per USITC schedules effective 2025–2026.

Year-over-year change: April 2025 monthly average vs. April 2026 monthly average.

Cross-references: BLS Producer Price Index (validation), RSMeans 2026 (benchmark comparison).

Update frequency: Monthly. Next update: June 2026.

Last updated: May 3, 2026.

Use Current Prices in Your Estimate

BuildStackHub's AI estimator applies these tracked prices automatically. Free, no signup required.

Get Free Tariff-Adjusted Estimate See Tariff Breakdown